Concrete Calculator

Pouring a slab, footing or pad? Enter the dimensions to get the concrete volume in cubic yards — how ready-mix is ordered — plus the number of 60 lb or 80 lb bags if you are mixing it yourself.

Your numbers

ft
ft
in
%
%

Result

Concrete needed
1.36
cubic yards
80 lb bags
62
60 lb bags
82
Volumecubic feet
36.67
Concrete needed
ItemAmount
Volume1.36 cu yd (36.7 cu ft)
80 lb bags62
60 lb bags82
Advertisement

How the volume is calculated

Volume is length × width × thickness, with the thickness converted from inches to feet. A 10 ft × 10 ft slab at 4 inches is 10 × 10 × (4 ÷ 12) = 33.3 cubic feet. Concrete is ordered by the cubic yard, and there are 27 cubic feet in a yard, so that slab is about 1.23 cu yd before waste.

Bags vs ready-mix

An 80 lb bag of premixed concrete yields about 0.6 cubic feet; a 60 lb bag, about 0.45. That slab needs roughly 56 of the 80 lb bags — which is why anything past about half a cubic yard is usually cheaper and far easier ordered as ready-mix from a truck. Bags make sense for post holes, small pads and repairs. Always round up and keep the waste allowance; a short pour is a ruined pour.

This is an estimate, not a structural design

These figures are for planning quantities on small projects. Anything structural — footings that carry a building, reinforced slabs, retaining walls — needs a design from a licensed engineer, who specifies the mix strength (psi), reinforcement and thickness. Don't size structure by estimate; safety depends on the professional calculation.

Reference estimate — not an engineering design. Incorrect sizing can create safety hazards: fire, electric shock or structural failure. Before building, have it validated by a licensed professional (engineer or electrician) and follow the applicable technical standards.